Our work
The work is built to leave evidence.
Every job below ran on a date, in a room, for a client we can name. What follows is what the technology had to do and what it took to do it. Premiers' summits and street criteriums, association AGMs and a tournament spread across a whole city.
The show is yours.
The precision is ours.
No case study is tagged with that service yet.

WBU Conference, Penticton: 3 curved LED walls, 2 projection screens and 52 moving lights.
Three curved LED walls.
Rigged by the venue's in-house supplier.- Large curved LED walls
- 3
- Larger projection screens
- 2
- JBL mini line array cabinets
- 28
- Moving lights on an MA3 console
- 52

Heart of Gold Gala, a timber warehouse with no way to hang anything.
A room with no rigging points
is a room built from the floor up.- LED wall across the stage
- 54 ft
- Guests, the client's figure
- 270
- Nothing flown from the building
- Ground-supported
- Warehouse to ballroom and back
- 4 days
- Raised, the Foundation's figure
- $1.09M

The Summer Edit, a civic bandshell that was a festival stage for one day.
An open park gives nothing back.
Every metre of coverage is built.- Planes of the structure clad in LED
- 4
- Layers of audio across the lawn
- 3
- In, on, and out the same night
- 1 day
- Closed early, on lightning
- 15 min

David Foster Foundation 40th: 3 mobile LED screens for an estimated 70,000 spectators.
An estimated 70,000 spectators.
Three mobile LED screens on the lawn and the street.- Spectators, estimated
- 70,000
- Mobile LED delay screens
- 3
- On the screens all day
- 1 tech
- Setup on 4 August to strike the night of the 8th
- 5 days

lululemon SeaWheeze, a start and finish line built in four overnight hours.
The street closures were limited.
The start and finish line had four hours, overnight.- Structures, all engineered
- 6
- SEG fabric backdrops
- 3
- Overnight, to set up the start and finish line
- 4 hours

Council of the Federation, the same room in five cities.
The building changes every year.
The requirement does not.- Cities across the relationship
- 5
- Rooms pulled separately for the Victoria meeting
- 5
- Official languages, live
- 2
- Separate 2026 engagements
- 3

Toyota Cheer Station, a crowd-powered stadium game that toured six cities.
A concourse is hard on microphones and networks.
The booth was designed so that no single failure stops the line.- Cities in fifteen weeks
- 6
- Sign-ups across seven match days
- 389
- Scored cheers
- 357
- Versioned builds shipped
- 74

Touchdown Kelowna, a 2,000-seat stadium built out to 20,000.
No rehearsal day.
Game one was the rehearsal.- Temporary capacity
- 20k
- LED panels
- 516
- Jumbotron LED walls
- 3
- Rehearsal days
- 0
- Announced crowd, 2026
- 19,108

FIFA World Cup 2026 hospitality, 1 World Cup across 3 different sites.
The audio ran in zones across the site.
An emergency announcement took priority in all of them.- Different sites, one World Cup
- 3
- On site at BC Place, load-in to tear-down
- 2 months
- Labour hours at BC Place
- Nearly 1,000
- Viewing sites in Richmond
- 11

IBABC AGM and Leaders Conference, the association in boxes.
Fifty-nine units in.
Forty-six out.- Units inbound to Kelowna
- 59
- Units outbound afterwards
- 46
- Ballroom, split three ways
- 1
- Breakout rooms
- 0

Memorial Cup 2026, seven Kelowna locations for one tournament.
A site staffed from seven in the morning until after midnight
is a different job from a site that is built once.- Locations across one city
- 7
- Artist riders across 2 programmed stages
- 23
- To past midnight, desk coverage
- 07:00
- QLab auto-saves in 25 minutes
- 28

Wealthsimple, the same format in two provinces.
A company that does business on a phone
still has to put its people in a room.- Cities, two provinces
- 2
- Sony Venice cinema cameras, full CCU chains
- 7
- Live wireless phone demonstration
- 1
- viewers of the public live stream
- 100K

BMO Vancouver Marathon, three sites before sunrise.
A gantry over a public street is not a stage.
It is a temporary structure over people's heads on city land.- Sites: park start, street finish, public plaza
- 3
- Gantries built to signed Schedule B engineering
- 2
- Start line scheduled, Pacific
- 05:15 to 09:00
- Finish line clear of the street
- 20:00

BC Tourism Industry Conference, three days in Kelowna.
Three days, plenary and breakouts.
Nothing escalated.- Days
- 3
- Screens, 9 by 16 feet
- 2
- Projection
- 8K
- Breakout rooms
- 3
- Delegates, Tourism Kelowna's figure
- 450+

The CHBA Okanagan Housing Awards of Excellence, a new design every edition.
The setup is very large
for the size of the ballroom.- Set design, every edition
- New
- Ceiling, the recurring design constraint
- Low
- LED wall carrying the program
- 1
- Shoot, with recording
- Multi-camera

UBC Okanagan Convocation, a ceremony in a room built for basketball.
A ceremony that is mostly names read aloud,
in a room built for basketball.- Systems built into the room: audio, video, lighting, rigging, drape, chairs
- 6
- Of what a graduation needs, supplied by the gymnasium itself
- 0
- LED wall carrying the program
- 1
- The year of this convocation
- 2026

BC NDP Convention, a centre LED wall and breakouts running in parallel.
Plenary, breakouts, and media, all live.
One technical plan underneath.- Floor space reclaimed
- 6 ft
- Breakout configurations
- 3
- Feeds: live and archive
- 2
- Delegates, the party's own figure
- 800+

Summoners Fest, a gaming studio on the 11th floor of an office building.
Power came up the side of the building.
The PTZ cameras were run from LA.- An office floor, turned into a gaming studio
- 11th floor
- Every broadcast camera
- 4K
- PTZ cameras operated remotely
- From LA
- Generator power, run up the side of the building
- Street to studio

UBC Imagine Day, a pep rally with captions on it.
Built in a warehouse.
Installed in an arena.- Install, 12 hours, for a 1-hour show
- 2 days
- Four-sided projection cube, flown
- 24 by 24
- Lighting fixtures
- 64
- Separate plans, plus the stream
- 6

Salmon Arm ROOTSandBLUES, four stages in one running order.
The hard part is not any single stage.
It is the gaps between sets.- Stages: main, barn, blues, shade
- 4
- Festival days
- 3
- LED trailers, the second new for 2025
- 2
- Changeovers, covered on another stage
- 15 min

Rock the Lake, one system and a different band on it every hour.
A festival is a relay.
The system has to survive every handover.- On site, for three days of show
- 6 days
- Truss lines over the stage
- 3
- Front of house desk positions
- 2
- Phases, build through dismantle
- 4
- Fans over three days, the promoter's figure
- 8,500+

Gastown Grand Prix, a race course built on a working street.
Spectators stand on somebody's sidewalk.
The businesses are still trading.- Signed engineering documents
- 4
- Days, two project managers
- 20-hour
- Closed public street course
- 1
- Years on the same street
- 4

Dragon Boat Festival, an audience that arrives by seawall.
The racing happens out on the water.
The screen is how anyone sees it.- Stages and zones on site
- 4
- Mobile LED screen
- 23 x 13 ft
- Crew on site
- 35
- Festival days
- 2

T100 Vancouver, a racecourse with no building to plug into.
No building to plug into.
So every zone brought its own.- Separately powered zones
- 8
- Independent audio systems
- 4
- Perimeter LED down the finish chute
- 40 m
- Show start, both race days
- 5 a.m.
- Participants and spectators, the Park Board's figure
- 11,000

Wildfire Resiliency and Training Summit, a wall as wide as the room.
Not a video with black bars.
A picture the width of the room.- LED panels, 42 across by 6 high
- 252
- Canvas width, 768 high
- 5376 px
- Pitch
- 3.9 mm
- Days, three costed programs
- 6
- Leaders at the conference, the Province's figure
- 700+

BC Budget lockup, where every feed leaves on a schedule.
Every outlet gets the same signal.
Nobody gets it first.- Zones: lockup, press theatre, breakouts
- 3
- Roland broadcast switcher
- VR-50 HD
- Third-party dependencies
- 2
- Early feeds
- 0

Swinging with the Stars, a hospice association's fundraising gala.
It got lit anyway,
from the floor and from the walls of the room.- Overhead rigging positions available
- 0
- Every lighting position, by necessity
- Ground level
- Shoot, with recording
- Multi-camera
- LED wall carrying the program
- 1

Invictus Games 2025, sport presentation across five venues.
The screens sat six feet up.
So a seated sightline cleared them.- Venues, two municipalities
- 5
- Days, start to finish
- 12
- Venues with cable-mat planning
- 4
- Post-event reports filed
- 3
- Spectators in venue, the Games' own estimate
- 125,000

Kelowna Chamber of Commerce, one day to build, show, and strike.
Load in, show, and load out,
all inside one day.- Load in, show, and load out
- 1 day
- Operating crew
- 4
- Ballroom access began
- Afternoon
- Interval to fix anything quietly
- 0

Touchdown Pacific, everything a ballpark does not have.
Everything the day needed
had to arrive on a truck.- LED panels, 25 wide by 11 high
- 275
- Maximum design wind speed for the screen
- 50 km/h
- Tents across the site
- 16
- Dedicated press box circuits
- 22
- Announced crowd, 2024
- 14,727

Denim on the Diamond, a ball diamond that has to be a ball diamond again on Monday.
The headline set is the straightforward part.
The twenty minutes before it is the job.- Consecutive editions built
- 3
- Truss lines, plus a ground package
- 3
- On site, to deliver three
- 6 days
- It is a ball diamond again
- Monday

CFL, 110th Grey Cup week.
The game is on Sunday.
The media operation starts Tuesday.- Venues, five municipalities
- 8
- Events on the schedule
- 13
- Crew positions
- 20
- Separate hard internet lines, kept apart on purpose
- 3

Summer Meeting of Canada's Premiers, one room published and one room protected.
One room published to the country.
One room not recorded at all.- Rooms across two floors
- 3
- Interpretation headsets
- 80
- Simultaneous livestreams
- 3
- Recordings, by requirement
- 0

PlayNow Sports Predictive Play Zone, a game-day program at BC Place.
The cage is the fixed asset.
The wall is a consumable.- Truss box, cut down from a 20 by 20 concept
- 15 by 15 ft
- Game dates scheduled
- 14
- Game-day deployments
- 4
- Compliance signage positions built into the structure
- 2

Canada's Farm Show, Launch Pad stage.
Twenty-two sessions went to air.
The floor never paused for one.- Panoramic LED wall
- 74 ft
- Of live, streamed sessions
- 3 days
- Sessions across three days
- 22
- Crew positions
- 20
- Economic impact, the show's own figure
- $19.2M

Canada Sevens, the tournament behind the tournament.
The sponsor is in frame.
We are not.- Teams across three days
- 28
- Locker rooms built in banquet rooms
- 12
- Each contracted room
- 4 x 5 m
- LED entrance arch
- 1
- Spectators over three days, Rugby Canada's figure
- 66,700

109th Grey Cup, two rooms in championship week.
The week belongs to the league.
The rooms were ours.- Shows in championship week
- 2
- Days before the game
- 4
- Screens in the awards room
- 5
- Languages, English and French
- 2

Styx, seven cities in thirteen days.
Every room was different.
The show was not.- Cities, BC to Manitoba
- 7
- Days
- 13
- Feet of pre-rigged truss
- 240
- Lighting fixtures
- 132

Heart of Gold Gala, six days for one evening.
Nothing in the roof to hang from.
One point six million raised.- Days on the job
- 6
- Build days before show day
- 3
- Revisions of the concept render
- 3
- Raised, the Foundation's figure
- $1.6M
More of the work is being written up. If you want the detail on something you do not see here, ask and we will send it.
Tell us what the room needs to do.
Same business day call with the right person on our team. You will not be asked to specify it yourself.












































