A black-tie gala in a timber warehouse: crystal chandeliers hang under the post-and-beam roof, magenta and blue light washes the plank walls and rafters, and a band plays on stage in front of an LED wall reading "Heart of Gold", with guests at dressed round tables seen mostly from behind

KGH Foundation

Heart of Gold Gala, a timber warehouse with no way to hang anything.

A century-old industrial warehouse, with a timber roof nobody is allowed to hang anything from. The gala goes in it anyway.

Everything stands on the floor.The warehouse holds nothing up but itself.

01 / The Brief

Take a black-tie fundraising gala into a century-old industrial warehouse and make the room look like the reason people bought the tickets.

The building gives you volume, timber and character, and takes away everything a ballroom normally supplies: no rigging points, no house lighting worth using, no house audio system, no screens, no power where the show needs it. Everything arrives on a truck.

The Foundation owns the evening: the program, the ask, the auction, the room's guests. SW builds the room they walk into and runs it while they are in it.

  • The warehouse from the outside in daylight: a long, low, weathered yellow-clad industrial building with boarded and small windows, a pair of grey doors at ground level and a rooftop rail, standing on an empty gravel apron under a blue sky with cloud

    The building from the outside, before the build.

  • The empty warehouse before the build: heavy timber posts and beams, plank walls, a bare concrete floor and industrial pendant lights down the length of the room

    The blank canvas. Site visit, 2026.

  • The warehouse from the opposite end before the build, daylight through an open bay door at the far wall, timber posts receding down the room and a bare floor

    The same room from the other end.

02 / The Work

A wall of LED including the floor to stand it on. The centrepiece is a fine-pitch LED wall in its own ground-support frame, on a decked platform so it has a level engineered base rather than sitting on the slab. Either side of the room, projection carries the same program onto rear screens, so the tables at the back read the screen as well as the tables at the front.

Audio that has to work in a timber box. Powered line array in clusters, with delay positions down the room and lip fill along the front of the stage, because a long hard-walled room does not carry a single cluster to the back. Subs under the stage, a digital console at front of house, monitors for the band, wireless microphones for the program, and wireless comms so the calls happen quietly. Outside, the reception tent runs an audio system of its own.

The gala from among the tables: guests in evening wear at dressed round tables in the foreground, crystal chandeliers hanging from the timber roof, magenta and blue light on the rafters and plank walls, and the band on stage beneath an LED wall reading "Heart of Gold"

Lighting that turns plank walls into a room. The show runs on a grandMA3. Moving-head profiles do the front wash and the on-stage looks, wash moving lights do the back wash, and LED washes aimed at the walls themselves are what turn raw plank into colour. Battery-powered fixtures on wireless DMX go where there is no cable path. And the chandeliers, the glamour the room is not supposed to have, are dimmed with the program rather than left on.

Cameras on the program. Two 4K camera kits on studio tripods, standing on their own risers, into an ISO switcher, with playback and a media server behind it. A comfort monitor faces the stage and a screen goes into the volunteer room, so the people running the night can see what the room sees.

The crew. The same core team carried through every phase: a production manager and a lead on each of audio, video and lighting, with technicians for the setup and the dismantle and camera operators for the show itself.

Guests in evening wear at round tables in the gala room, seen between two heavy gold-lit curtains, with a crystal chandelier hanging from the timber roof and the rafters lit warm behind them
The room on the night, seen through the curtains.

In the client's words

Most AV companies ask to see your venue. SW asked to see our abandoned warehouse.

The Heart of Gold Gala — twice named Canada’s Best Fundraising Event — is a black-tie gala held every two years for 270 guests. This year, we held it in a 100-year-old warehouse on a decommissioned mill site: no power, no water, no bathrooms, no kitchen. SW helped us plan, design, co-ordinate and execute the audio visuals — and the night went off flawlessly. Their crew conjured light, sound, and pure magic out of an empty shell.

If SW can turn a derelict warehouse into a ballroom, imagine what they can do with an actual venue.

Sandy Dawson, on behalf of the Heart of Gold Committee

The stage on the night: a crystal chandelier hanging in the timber roof space above a wide LED wall carrying the event's name over a leopard print, a singer in a floral jacket at a white piano with a pink feather boa, warm light on the rafters and plank walls, and a drum kit waiting behind him
The same room on the night, under the timber roof.

03 / The Outcome

The Foundation made its own film of the evening. It is on our galas and fundraisers page, and it shows the room the way the guests found it.

Four days from a bare concrete floor to a ballroom and back to a bare concrete floor.

The Heart of Gold room before doors: round tables set under crystal chandeliers in a timber hall, magenta uplight on the walls, the band's gear waiting on the stage, and the event's name across the frame as the film's opening title
Video courtesy of the KGH Foundation.

A room with no rigging points

is a room built from the floor up.

Planning something like this?

Every event has a start time.

We make sure the technology is ready when it does. Tell us the date, the room, and what has to happen in it. You get a plan and a number back, from the people who would run it.

One of more than 4,000 events SW runs a year.

See more of our work