Updates

When does an event need union crew, and when does it not?

It is a question about the venue and the work, not about the size of your event. What to ask, what can vary, and why you should not be the one translating labour rules.

This is a question about the venue and the work being done, not about how big your event is.

This one is usually about the venue and what work we're actually doing, not whether your event is big or small. And please don't feel like you need to become an expert on union agreements, give us the venue contact and we'll figure out what applies and tell you what we actually need.

What actually determines it

  • First thing we find out: is the venue union?
  • Then: what work is actually covered?
  • Union venue does not always mean every single person working on your show has to be union.
  • It can apply differently to: Loaders, Stagehands, Rigging, AV technicians, Electrical, Equipment operators
  • There can be minimum crew sizes.
  • There can be minimum call times.
  • Break and overtime rules may be different.
  • We want to know all of this before we quote your labour.
  • If you're still choosing a venue, ask the question then. It can make a difference to your production budget.
  • This is really something your AV company and venue should sort out between them. You shouldn't be stuck in the middle translating technical labour rules.

Who decides, and when it gets decided

In most cases the building or the tour decides, not you, and it is decided before anyone sends you a number. If your venue has a collective agreement covering the work, the answer already exists in writing. IATSE Local 118, the Vancouver local, lists roughly 20 current collective agreements on its own site, including the City of Vancouver for Vancouver Civic Theatres, with a term running 2023-01-01 to 2026-12-31, plus Live Nation Canada, the Pacific National Exhibition, and the Arts Club Theatre (IATSE Local 118, agreements list). That list is public. The terms inside each agreement are not, they sit in the individual agreement documents, so no rate and no penalty should be quoted to you until somebody has the agreement that covers your date and your building in front of them.

A touring show brings the answer with it

If a tour is coming into your event, the crew requirement travels with the show. IATSE has run a yellow card system since 1912: the card moves with a touring production and states, department by department, how many local union crew are required for load-in, for performances, and for load-out (IATSE, touring overview, with a fuller public explainer from IATSE Local 26 in Washington, DC). IATSE is an international union with locals on both sides of the border, so read the Local 26 page as how the system works rather than as what a specific Vancouver call will look like.

Minimum calls are why a one-hour task can invoice as four

This is the part that surprises people. Union work is bought in blocks. Local 118's own dispatch page says a cancellation inside 24 hours, and in some cases 16, can trigger a four-hour minimum payment depending on which agreement applies (IATSE Local 118, dispatch FAQ).

For a sense of how these documents read, the Fox Theatre in Atlanta publishes its Stagehand General Conditions, dated 2022-01-06: every stagehand reporting for a work call gets a four-hour minimum, a commercial show load-in carries an eight-hour minimum, and a load-out carries four (Fox Theatre, Stagehand General Conditions, items 11 and 13). That is Atlanta, IATSE Local 927 territory, and one venue's negotiated terms. It is not BC practice and those figures are not your numbers. They are here to show the shape of the thing, not the price.

Two rules that apply whether or not the venue is union

The first is employment law, which sits underneath every crew we send. BC's Employment Standards Act, section 40, sets time-and-a-half after eight hours in a day, double time after 12 hours in a day, and time-and-a-half after 40 hours in a week (Employment Standards Act, BC Laws). A 10-hour crew day is a familiar scheduling unit in live events, but 10 hours is not a legal trigger. The statutory hours above are the ones a crew schedule has to be built against.

The second is rigging. The International Association of Venue Managers, in a post on its own blog that carries no date, reports venues revising their rules so that all rigging installations must be performed under the supervision of a supervisor certified through the Entertainment Technician Certification Program (IAVM blog, ETCP program). That reporting covers the association's own membership rather than BC specifically, so ask your venue directly. In BC, the rigging rules live in WorkSafeBC's Occupational Health and Safety Regulation, Part 15 (WorkSafeBC, OHS Regulation Part 15), and Actsafe is the province's health and safety association for arts and entertainment.

What we need from you

A name, an email, and a phone number for whoever handles production at the venue. That is the whole ask. Give us that early enough and you get the labour answer in writing before you sign anything, rather than a revised number after the room is booked.

Start a show

Tell us what the room needs to do.

Send a brief, a deck, a date and a city, whatever exists. The right person on our team is on the phone the same business day.