A university gymnasium built out for a graduation ceremony, hundreds of white folding chairs in rows on the court, black drape walls with three blue banners carrying university crests, two large screens reading Graduation 2025, flown line arrays and a lighting truss under the roof steel and a basketball hoop at the right

UBC Okanagan · 2026

UBC Okanagan Convocation, a ceremony in a room built for basketball.

UBC Okanagan's convocation, in a Kelowna gymnasium: audio, video with an LED wall, lighting, rigging, drape, and chairs.

Six Systems. One Gymnasium.A Room Built From the Floor Up.

Pictured: the 2025 convocation.

01 / The Brief

A Ceremony in a Room That Is Not a Ceremonial Room.

UBC Okanagan's convocation is a ceremony in a room that is not a ceremonial room. The venue is a university gymnasium, which supplies a floor, a roof, and nothing else that a graduation needs. Seating, sightlines, the look of the room, and the systems all arrive on trucks.

SW supplied the full audio package, video including an LED wall, and the lighting package, plus the rigging package, the drape package, and the chairs. That last part is the shape of the job: this is not a technical package dropped into a venue, it is the venue being built.

The contributor describes SW's involvement with this convocation as going back many years, with each edition presenting different challenges.

02 / The Work

Building the Room, Then the Technical Package.

Building the room

Rigging, drape, and chairs came from SW alongside the technical package. Drape is what turns a gymnasium into a hall, rigging is what allows anything to be above the floor in a building not designed to hang from, and the chairs are the audience.

The technical package

Full audio for a ceremony that is mostly names read aloud and has to be intelligible from the back, an LED wall for video, and the lighting package over the platform and the room.

A corner of the convocation platform in the university gymnasium, full height black drape masking the wall, a line array and a lighting truss flown from the exposed roof steel with a screen hung beneath the truss, a crest banner at the left, and an orchestra position of timpani, drum kit and music stands beside the platform chairs
Pictured: the 2025 convocation.

03 / The Outcome

Built From the Floor Up.

The room was built from the floor up, for a ceremony the gymnasium was never designed to hold.

Audio. Video. Lighting. Rigging. Drape. Chairs.

A ceremony that is mostly names read aloud,

in a room built for basketball.

Planning something like this?

Every event has a start time.

We make sure the technology is ready when it does. Tell us the date, the room, and what has to happen in it. You get a plan and a number back, from the people who would run it.

One of more than 4,000 events SW runs a year.

See more of our work