A Municipal Ballpark. A Professional Football Game.Everything Arrived on a Truck.
An LED wall on a truss arch engineered and rated for outdoor use.
- 275LED panels, 25 wide by 11 high
- 50 km/hMaximum design wind speed for the screen
- 16Tents across the site
- 22Dedicated press box circuits
- 14,727Announced crowd, 2024
01 / The Brief
The Load List Underneath Everything.
A stadium is mostly the things you never see. Power at the field edge. A press box with enough circuits for the people in it. Somewhere for the visiting team to change. Shore power for a broadcast truck. A ballpark has a fraction of that and a professional fixture assumes all of it.
So the problem is not the screen. It is the load list underneath everything: press box circuits, power to the scoreboard and the broadcast truck, and network in place a month before anyone plays.
SW's scope was the temporary infrastructure and the technical build on top of it.
02 / The Work
Everything a Ballpark Does Not Have.
A screen drawn by SW and sealed by an engineer
The main LED is specified as twenty-five panels wide by eleven high, 275 panels in all. SW drew the set. A registered structural engineer sealed it for structural adequacy and signed an assurance addressed to the City of Victoria, a month before the game.
And it is a screen that comes down in wind
The drawing sets a maximum design wind speed of 50 kilometres an hour and instructs that the screen be lowered whenever that speed or greater is expected. A 275-panel wall standing on a ballpark field is a sail, and the drawing says so on its face.
Two trusses, calculated
The rigging workbook carries a loaded calculation for both trusses, with the per-point loads worked out.
SW planned the power for the sideline LED, the scoreboard, the broadcast truck, field audio and the press box, including twenty-two dedicated press box circuits.
And the part that is not audio-visual at all
Office trailers for the players, the coaches, the therapy room and the club's own staff, plus shower and washroom trailers. Sixteen tents across the site for volunteers, catering, players, the network team and concessions, and power planned for the food trucks.
Some of it had to be live weeks early
Network devices in the grandstand press boxes were scheduled a month before the game, so a fibre connection could be converted and tested.
And the plan counts what is missing
The tent inventory is written against what was available. The shortfall is in the document, in a column, before anyone arrived.
03 / The Outcome
A Municipal Ballpark, Planned as a Professional Stadium.
SW planned a municipal ballpark as a professional stadium.
The screen's structural assurance is addressed to the City of Victoria and signed by a professional engineer. The trusses carry a calculation. The tents carry a shortfall, counted in advance. SW delivered the temporary infrastructure and technical build that let a ballpark host a professional football game.
Signed engineering. Calculated trusses. Shortfalls counted in advance.
Everything the day needed
had to arrive on a truck.