About 20,000 Seats. No Overhead Rigging.No Rehearsal Day.
- 20kTemporary capacity
- 516LED panels
- 3Jumbotron LED walls
- 0Rehearsal days
- 19,108Announced crowd, 2026
01 / The Brief
Bring the Stadium With You.
Taking a professional football game to a community field means bringing the stadium with you. Audio, video, scorekeeping, power, lighting, staging, rigging, and broadcast all arrive on trucks and leave the same way.
The audio problem was the hard one. The temporary grandstands rose high, and there was no overhead rigging to fly from. A permanent stadium solves coverage with height it already has. Here the coverage had to be built from the ground.
There was also no test day. The first game was the rehearsal.
SW partnered with the Lions on the delivery of the temporary stadium and supplied the technical systems inside it: sitewide power distribution, audio, and video. The stadium itself was not SW's build.
02 / The Work
Audio, Video and Power, Built From the Ground.
Audio
A distributed system across 90 speakers, designed to reach 20,000 in an expanded seating footprint without overhead rigging, covering grandstands at height from ground-supported positions. Audio and video relays carried into the VIP zones as well as the bowl.
Video and presentation
Three Jumbotron LED walls for the audience and 80 metres of perimeter LED around the field, 516 panels between them. A scoreboard system feeding both the live broadcast and the bowl, cameras and switching, and video monitors through the site. SW also ran in-bowl video production for the entertainment.
Broadcast
Wireless and stationary cameras, a media production suite, and the signal path out, coordinated with the broadcaster.
Everything else
One stage, rigging, lighting, and temporary generator power distributed across the site, with related activation support at other Kelowna locations during the same window. Fifteen crew set up, deployed, and ran it.
Game two
With no rehearsal before game one, the operating approach was revised between the two games based on what the first one showed.

03 / The Outcome
Both Games Ran.
Both games ran. Audio reached the expanded seating, video and lighting rolled out across the site, and the approach was sharpened between game one and game two rather than after the event. SW built the audio, video and power for a 20,000-seat crowd from the ground, with no rehearsal day.
Roughly 2,000 seats. About 20,000 fans. No rehearsal day.
No rehearsal day.
Game one was the rehearsal.
Planning something like this?
Every event has a start time.
We make sure the technology is ready when it does. Tell us the date, the room, and what has to happen in it. You get a plan and a number back, from the people who would run it.
One of more than 4,000 events SW runs a year.