The stadium from the air on game day: a Canada flag held out across midfield, packed grandstands along the far sideline and behind both end zones, a standing crowd in front of the roofed stand in the foreground, and white tents around the site

BC Lions · 2026

Touchdown Kelowna, a 2,000-seat stadium built out to 20,000.

A community stadium with roughly 2,000 permanent seats had to hold about 20,000 for two regular-season games, with no permanent event infrastructure.

About 20,000 Seats. No Overhead Rigging.No Rehearsal Day.

01 / The Brief

Bring the Stadium With You.

Taking a professional football game to a community field means bringing the stadium with you. Audio, video, scorekeeping, power, lighting, staging, rigging, and broadcast all arrive on trucks and leave the same way.

The audio problem was the hard one. The temporary grandstands rose high, and there was no overhead rigging to fly from. A permanent stadium solves coverage with height it already has. Here the coverage had to be built from the ground.

There was also no test day. The first game was the rehearsal.

SW partnered with the Lions on the delivery of the temporary stadium and supplied the technical systems inside it: sitewide power distribution, audio, and video. The stadium itself was not SW's build.

02 / The Work

Audio, Video and Power, Built From the Ground.

Audio

A distributed system across 90 speakers, designed to reach 20,000 in an expanded seating footprint without overhead rigging, covering grandstands at height from ground-supported positions. Audio and video relays carried into the VIP zones as well as the bowl.

Video and presentation

Three Jumbotron LED walls for the audience and 80 metres of perimeter LED around the field, 516 panels between them. A scoreboard system feeding both the live broadcast and the bowl, cameras and switching, and video monitors through the site. SW also ran in-bowl video production for the entertainment.

Broadcast

Wireless and stationary cameras, a media production suite, and the signal path out, coordinated with the broadcaster.

Everything else

One stage, rigging, lighting, and temporary generator power distributed across the site, with related activation support at other Kelowna locations during the same window. Fifteen crew set up, deployed, and ran it.

Game two

With no rehearsal before game one, the operating approach was revised between the two games based on what the first one showed.

An empty stadium bowl on a clear day: speaker stacks on ground-supported stands along the front of a temporary aluminium grandstand, dark perimeter boards along the track, an LED wall on truss at the far end of the field and mountains beyond
Touchdown Kelowna, 2026: in-bowl speakers on ground-supported stands along the sideline, with an LED wall at the far end.
  • Crew hanging LED video wall panels on ground-support truss at the stadium, road cases and coiled cable in the foreground, the temporary grandstand and the field visible beyond
  • A broadcast camera with a long box lens on a tripod beside the field, in front of a truss-flown LED screen showing the BC Lions game-day matchup graphic and score bug, a BC Lions-branded riser skirt in the foreground
  • The BC Lions Backyard Party Stage on a lawn on a sunny day: a mobile stage with a flown roof and skirted deck, drums, guitars and amplifiers set up, tall Touchdown Kelowna and British Columbia banners on either side, a white tent and fencing beyond

03 / The Outcome

Both Games Ran.

Both games ran. Audio reached the expanded seating, video and lighting rolled out across the site, and the approach was sharpened between game one and game two rather than after the event. SW built the audio, video and power for a 20,000-seat crowd from the ground, with no rehearsal day.

  • Broadcast control position at the stadium, replay system, multiviewer and switcher on draped tables, fan-engagement graphics on the front monitors, road cases and an open roller door beyond

Roughly 2,000 seats. About 20,000 fans. No rehearsal day.

No rehearsal day.

Game one was the rehearsal.

Planning something like this?

Every event has a start time.

We make sure the technology is ready when it does. Tell us the date, the room, and what has to happen in it. You get a plan and a number back, from the people who would run it.

One of more than 4,000 events SW runs a year.

See more of our work