One Structure. Two Teams.Compliance Built In, Game Day After Game Day.
- 15 by 15 ftTruss box, cut down from a 20 by 20 concept
- 14Game dates scheduled
- 4Game-day deployments
- 2Compliance signage positions built into the structure
01 / The Brief
A Game the Crowd Could Play, in a Working Concourse.
PlayNow Sports is BCLC's sports betting product, and it needed a presence on the BC Place concourse on game day. Not a display stand: a game the crowd could play.
The concourse sets the constraints. It is a public circulation route that has to keep circulating, so the build has to contain itself rather than spread. The audience is moving, so the whole thing has to read at a glance from a distance. And the same structure has to work for a Canadian Football League crowd and a Major League Soccer crowd, in the same building, weeks apart, with a warehouse in between.
SW carried the design, the fabrication and print procurement, the technology, and the game-day labour on each deployment.
02 / The Work
A Netted Truss Box. A Two-Player Game. Compliance Built In.
Three concepts, then one
SW's design bench drew three routes: a Sportscast studio treatment, a Tunnel the crowd walked through, and a Predictive Play Zone, a netted cage holding a two-player throwing game. The Predictive Play Zone was selected and resolved down to a compact truss box that fits a circulation route.
A freestanding truss box, netted
Four corner towers on ballasted bases, cross-members over the top, and netting across the top and the sides. The netting is what makes a throwing game possible in a corridor full of people: it keeps every ball inside the footprint. The front face is left open as the entrance, so the structure explains its own way in.
A two-player game on a printed wall
Player one on the left, player two on the right, mirrored target circles and a bin of balls at each throwing position, so two strangers can play each other without a host explaining the rules.
Compliance built into the structure, not added to it
Responsible gambling messaging on a stanchion at the approach, and 19-plus entry signage on the entrance post with the arrow. A regulated product in a public space with a mixed-age crowd has to control who plays, and the build does that with its own furniture rather than with a supervisor and a clipboard.
Light and screen against concrete
Blue uplighting lifts a black structure out of a grey concrete corridor, and linear fixtures under the top members keep the wall and the balls readable. Portrait screens at the entrance carry the instructions, under an illuminated header sign readable along the concourse from both directions.
The wall changed with the tenant
The printed backdrop was not one graphic reused. SW delivered a reprint and install for each tenant team's date, so the structure stayed and the artwork changed with whichever team was playing. That is the part of a redeployment that does not show up in a photograph: the cage is the fixed asset and the wall is a consumable.
Built to come apart
Every deployment was a same-day turn, in and out on game day, with the structure stored by SW between dates.

03 / The Outcome
Designed Once. Deployed Game Day After Game Day.
The structure was designed once and then went up and came down on game day after game day, for a football crowd and a soccer crowd in the same building, and it kept its own footprint inside a working concourse every time.
One structure. A football crowd and a soccer crowd. Its own footprint, every time.
The cage is the fixed asset.
The wall is a consumable.
Planning something like this?
Every event has a start time.
We make sure the technology is ready when it does. Tell us the date, the room, and what has to happen in it. You get a plan and a number back, from the people who would run it.
One of more than 4,000 events SW runs a year.









