Three Days to Build. One Evening.Two Days to Strike.
- 6Days on the job
- 3Build days before show day
- 3Revisions of the concept render
- $1.6MRaised, the Foundation's figure
01 / The Brief
A Winery With No House Rig. A Week of Arrivals.
A gala is one night and the room has to be finished before anyone arrives. At a working winery there is no house rig, no hung plot to inherit, and no floor until somebody lays one.
And a gala of this kind is not one supplier. The production schedule runs a week of arrivals: chandeliers, linens, flowers, furniture, and a floor to be installed and later uninstalled. Every one of them needs the room at a different hour.
The foundation owned the program, the auction, the donors and the cause. SW's scope inside that week is the technical environment.
02 / The Work
Truss First. Everything Else Hangs Off It.
Truss, drape, stage, projection, lighting and flooring, built in the order the room needs. SW built the technical environment across the days before the show, with the décor teams coming in behind it.
The rig goes in first because everything else hangs off it
Truss and stage before decoration is not a preference: the chandeliers, the flowers and the furniture all arrive into a room whose ceiling is already committed, and a truss that moves late moves the whole week with it.
Two days to take it out
Strike and load-out, then the floor itself uninstalled. A one-evening gala with a six-day footprint is the shape of an estate that is not a venue.
Designed before it was built
SW produced concept renders of the event centre before load-in.
03 / The Outcome
A Room Built for One Evening.
SW built the room in three days, had it dressed and lit before the guests arrived, and had the floor out two days later.
The Foundation holds the gala once every two years, and it has brought SW back to every one of them. 2024 was an aerospace centre. 2026 was a century-old warehouse on a decommissioned mill site, and has its own case.
The Foundation reported $1.6 million raised at this gala. A room built for one evening, by a team the Foundation has brought back for every Heart of Gold since.

Three days to build. One evening. Two days to take it out.
Nothing in the roof to hang from.
One point six million raised.
Planning something like this?
Every event has a start time.
We make sure the technology is ready when it does. Tell us the date, the room, and what has to happen in it. You get a plan and a number back, from the people who would run it.
One of more than 4,000 events SW runs a year.