A mobile stage built on a closed Gastown street, its roof and skirt carrying Global Relay and Gastown Grand Prix branding, with a black-draped tent, crew road cases and traffic barriers on the wet brick and shopfronts behind

Gastown Grand Prix · 2025

Gastown Grand Prix, a race course built on a working street.

A bike race has no venue. It has a street that has to be given back. Gastown Grand Prix, Cambie and Water Street, Vancouver. SW has been on the job in 2024, 2025 and 2026.

A Race Course. A Working Street.Built, Raced and Returned.

01 / The Brief

A Permitting Problem Before a Production One.

A criterium runs on a closed public road in a working neighbourhood, and everything that makes it a race has to be brought in, stood up on a surface that belongs to the city, and taken away again.

Which makes it a permitting problem before it is a production one. A truss gantry over a road and tents on a public street are temporary structures on city land: they need drawings, a professional of record, and an inspection while they are standing.

And Gastown is not a closed site. It is a neighbourhood with tourists in it, pavements that stay in use, and businesses that stay open.

The race owned the course, the riders and the program. SW built the technical structures it ran through.

02 / The Work

Signed Engineering on a Working Street.

A signed engineering package, not just a drawing

The truss structure at Cambie and Water Street carries issued-for-construction drawings and signed engineering documents, a separate field review of the tents, and an electrical permit alongside them. The structure is signed off after it has been inspected in place.

A start-finish structure and a gantry over the road

SW's build carried a Stageline SL100 mobile stage and a truss gantry, each drawn and powered to its own plan.

Sound designed for a street, not a room

A site sound map, an audio cable plan, and a sound truck packed to travel, because a course that runs several blocks needs coverage along its length rather than at one end.

Camera positions and a mesh network

Camera riser drawings and a mesh camera plan, for a course nobody can see all of from one place.

Twenty-hour days, with two project managers

A street closure has to be built, raced and returned inside one permit window.

An accessibility fix made on site

The crew built a wheelchair ramp for the sidewalk. A public street closure has pavements on both sides of it, and the people using them did not enter a race.

And it is the same street, year after year

SW has worked it in 2024, 2025 and 2026, on a street the city needs back.

03 / The Outcome

A Signed Package. A Race. Usable Pavements.

The street carried a signed engineering package, a stage and a gantry for one day of racing, and the pavements beside it stayed usable because somebody built a ramp for them.

One street. Signed engineering. Built, raced and returned.

Spectators stand on somebody's sidewalk.

The businesses are still trading.

Planning something like this?

Every event has a start time.

We make sure the technology is ready when it does. Tell us the date, the room, and what has to happen in it. You get a plan and a number back, from the people who would run it.

One of more than 4,000 events SW runs a year.